The scope of work includes the replacement of the old DG with a new DG set with the capacity of 1500 KVA & providing fresh air systems for the DG room. It was a huge challenge in bring out the OLD DG Set from basement to the outside the building. Made the wall openings and provided permanent opening with metal doors and ramp. Also the Air intake was less inside the DG room, Provided the three nos of 24000 CFM nos with MS Ducting. Completed within the timelines and obtained Statutory Approvals.