The project includes replacement of existing chilled water system with air cooled chillers with VRF system feeds to entire work space for more than 1.85 lakhs SFT area. VRF system with capacity of 800TR was installed which consumes 50% less electricity when compared to the old system & provides better efficiency in Air conditioning system.