Cafeteria Renovation

Project Info

The Scope of work in this project was to transform the existing space into a lively environment with interior modifications. We transformed the space with in short time. We modified the existing counters, MS Frames covering the services, hand wash, new decorative lighting, graphics and signages. We also introduced fresh air unit with ducting in cafeteria to reduce the temperature compared to outside atmospheric temperature.

Completion Period

30 Days

Type of Contract

Design & Build

Surface Area

5,300 Sqft

Watch VIdeo
Scroll to Top